8:47
●●●●○ WiFi 97%

MagicTix

🔔
MR
Ride Inspections
Sat, Aug 2, 2026
Today's Progress 12 / 18
12 Complete
1 In Progress
1 Failed
4 Pending
🎡
Ferris Wheel
Daily Pre-Op · Mike T.
✓ Complete
8:15 AM
🎠
Tilt-A-Whirl
Daily Pre-Op · Sarah K.
✓ Complete
8:22 AM
🎲
Scrambler
Daily Pre-Op · Tom G.
✓ Complete
8:30 AM
🔀
Zipper
Daily Pre-Op · Jake R.
↻ In Progress
8:45 AM
🎪
Gravitron
Daily Pre-Op · Unassigned
⏳ Pending
Pharaoh's Fury
Daily Pre-Op · Unassigned
⏳ Pending
⚠ ACTION REQUIRED — SAFETY ISSUE DETECTED
🚨
Yo-Yo
Daily Pre-Op · Sarah K.
⚠ Safety restraint issue flagged
✗ FAILED
8:40 AM
🚀
Enterprise
Daily Pre-Op · Unassigned
⏳ Pending
🔥
Ring of Fire
Daily Pre-Op · Unassigned
⏳ Pending
Zipper
Chance Rides Inc. · Serial #ZP-4421
Daily Pre-Op Inspector: Jake R.
📷 Tap to add ride photo
8 of 14 items checked
57%
Safety Checklist
Structural bolts torqued to spec
Checked 8:46 AM
Safety restraints — all cars
Checked 8:48 AM
Electrical connections secure
Checked 8:50 AM
Hydraulic lines — no leaks
Checked 8:52 AM
Emergency stop functional
Checked 8:53 AM
Gondola floors — no damage
Checked 8:55 AM
Ride perimeter clear
Checked 8:56 AM
Operator controls responsive
Checked 8:58 AM
Safety signage visible
Height measurement station
Lighting — all bulbs working
Ground fault protection test
Load test — empty cycle
Load test — weighted cycle
Compliance
Certification Status
18 Rides Certified
15
Current
2
Expiring
1
Action Req
Inspection Schedule
Daily Pre-Op Inspection
Due every morning before gates open
Done Today
Weekly Structural Check
Due every Monday · Last: Jul 28
Next: Aug 5
Monthly NDT Testing
Non-destructive testing · Scheduled
Aug 15
State Annual (TX TDLR)
Texas Dept. of Licensing & Regulation
Sep 1
Insurance Renewal
Liability & equipment coverage
Oct 15
Recent Documents
📄
Daily Inspection Report — Aug 1
PDF · 2.4 MB · Uploaded by Mike T.
🎯
TX TDLR Certificate — Ferris Wheel
Certificate · Valid until Sep 2027
📋
NDT Report — Jul 2026
Report · 5.1 MB · All rides passed
🎯
Insurance Certificate 2026-2027
Certificate · Expires Oct 15, 2026
📄
Weekly Structural — Jul 28
PDF · 1.8 MB · Sarah K.
Live Status Board
☀️
82°F Sunny · Wind: 8 mph
All rides operational — no weather holds
12/18
Rides Open
~8 min
Avg Wait
4,280
Riders Today
Open (12)
Down (1)
Inspecting (1)
Closed (4)
Ferris Wheel
Open
Inspected 8:15 AM · Mike T.
Tilt-A-Whirl
Open
Inspected 8:22 AM · Sarah K.
Scrambler
Open
Inspected 8:30 AM · Tom G.
Yo-Yo
Down
Failed 8:40 AM · Restraint issue
Zipper
Inspecting
Started 8:45 AM · Jake R.
Carousel
Open
Inspected 7:50 AM · Mike T.
Bumper Cars
Open
Inspected 7:55 AM · Tom G.
Pirate Ship
Open
Inspected 8:00 AM · Sarah K.
Teacups
Open
Inspected 8:05 AM · Mike T.
Fun Slide
Open
Inspected 8:08 AM · Tom G.
Tornado
Open
Inspected 8:10 AM · Jake R.
Merry Mix-Up
Open
Inspected 8:12 AM · Sarah K.
Gravitron
Closed
Pending inspection
Pharaoh's Fury
Closed
Pending inspection
Enterprise
Closed
Pending inspection
Ring of Fire
Closed
Pending inspection
Inspection History
Today — Sat, Aug 2, 2026
Ferris Wheel PASS
Daily Pre-Op · Mike T. · 8:15 AM
Duration: 18 min · 14/14 items
Tilt-A-Whirl PASS
Daily Pre-Op · Sarah K. · 8:22 AM
Duration: 15 min · 12/12 items
Scrambler PASS
Daily Pre-Op · Tom G. · 8:30 AM
Duration: 12 min · 10/10 items
Yo-Yo FAIL
Daily Pre-Op · Sarah K. · 8:40 AM
Duration: 22 min · 9/12 items
Issue: Safety restraint latch on Car #7 not engaging fully
Yesterday — Fri, Aug 1, 2026
All Rides (18) PASS
Daily Pre-Op · Full team · 7:30-9:15 AM
All 18 rides passed. Zero issues.
Zipper PASS
Post-Maintenance · Jake R. · 2:15 PM
Duration: 45 min · Bearing replacement verified
Mon, Jul 28, 2026
Weekly Structural PASS
All 18 rides · Sarah K. & Mike T.
Duration: 4.5 hrs · Full structural review
Zipper FAIL
Weekly Structural · Sarah K. · 10:30 AM
Duration: 55 min
Issue: Bearing wear on gondola #3 above threshold